This site may use cookies to deliver services in accordance with the Cookie Files Policy. You can specify the conditions for storage and access for cookies on your browser.
Close

News

2016-10-27
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole

BOX SEVEN

Is the newest housing area in Berlin which will be finished by the end of 2017.

Each of the 615 flats in 6 buildings will be equipped with both external and internal sun protection systems provided by Selt.

Basic data:

Object: housing apartments

Realisation time: November 2015 - October 2017

Place: Berlin

Architect: Bonanni Architekten, Patzschke Planungsgesellschaft Scheel

Systems: Refleksol 120, Markisolettes 120, C80 Flat Venetian Blinds, Dakar Awnings, Refleksol XS

Number of systems: 1792 pieces

See more ...
2016-07-15

Official announcement

Valid bank account numbers of SELT Sp. z o.o. and SELT SPS have not changed nor they will change in the near future. Please make sure that the account numbers are right.

 

SELT Sp. z o.o.
ul. Wschodnia 23A
45-449 Opole
NIP 754-310-33-11
Account number:
EUR:      PL92 1050 1504 1000 0090 3078 8724

 

SELT SPS
Ul. Głogowska 24A
45-315 Opole
NIP 754-013-36-65
Account number:
  EUR :   PL36 1050 1504 1000 0090 3021 2873

See more ...
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole
2015-11-25
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole

48 Leicester Square London

The building placed on the Leicester Square is undergoing complete renovation and will be reopened in 2016. 

Project was prepared by Make Architects and includes change of the roofing, facades, reconstruction of the interior as well as application of modern sun protection solutions on all uneven facades. 

The requirement for the realisation of this historic building was design of new solutions, according to the outlines by the investor and designers. 

The scope of work covered by the agreement includes also the delivery and installation of the Refleksol system. 

Realisation time: Feb-June 2016

See more ...
2015-08-20

The Pergamon Museum in Berlin

We are very pleased to inform, that yesterday our subsidiary Selt SPS GmbH signed the contract for the comprehensive realization for deliveries and installation of the sun shading systems at the Pergamon Museum in Berlin.
Realization includes the design of the rolled-up textile blinds with projection nearly eight meters high, finished with arched profile matching to the shape of the upper parts of arched windows, with cable guides inside the aluminum guide rails. The offer will be supplemented by rolled-up  blinds with regular shapes and with standard Refleksol XXL blinds.  It also includes the design, supply and installation of the substructure.
The Pergamon Museum is one of the most prestigious and, at the same time, one of the most difficult realization from company’s portfolio.
Number of pieces, technology and contract value are trade secret.
Used systems: Veranda FTS Arch, Veranda FTS, Refleksols XXL
Realization time: 2016

See more ...
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole
2015-08-06
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole

Q22

Selt SPS Company is currently starting one of the most prestigious projects of office buildings Q22 in Warsaw. This office block was designed by one of the most renowned architecture office APA Kuryłowicz & Associates in cooperation with Polish branch of Buro Happold. The architectural height of the building will be 195 meters and it has already got the BREEAM Interim Excellent certificate.
The assembly works of substructures provided for the installation of sun shading systems are currently starting. 
Building has a quartz crystal shape and it is already mostly glazed, what allows to start the works in the interior.


Basic data
Investor: Echo Investments, Warszawa
Design office: APA Kuryłowicz&Associates/Happold Polska
Number of storeys: 43 with basement (5 storeys)
Sun protection systems in the project: by Selt SPS
Systems provided: Venetian blinds C50 Slim, Venetian blinds C50 Trapeze, Refleksol, Veranda FTS, Veranda 206.
Anticipated completion date: 2016-17

See more ...
2015-07-21

Business Garden Wrocław

Selt SPS Company has been chosen as a supplier of sun shading systems for the Business Garden  in Wrocław.
Realization includes the design of systems with integrated with the façade guide rails, coordination and supply with the installation of 1900 units of Refleksols at first two buildings.

Basic data:
Investor: Vastint
Design office: APA Wojciechowski
General contractor: Budimex
Realization time: September 2015 – April 2016
Used systems: Refleksols
Quantity: 1900 units

See more ...
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole
2015-06-24
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole

Qualicoat certificate

Selt SPS has joined those who have powder coating facility marked by Qualicoat certificate.The quality of all processes taking place in the powder coating facility opened in 2011 was confirmed by the controls and audits conducted.The production line of Selt powder coating facility has the efficiensy of 1 mln m2 per year, and is equipped with Wagner equipment which includes spray booth with software as well as Super Cube booth for fast colour change. It is made of a particular material preventing the paint from clinging.Moreover, Selt SPS has also decided to install spray booth for manual application, also with Wagner software, for painting details in small quantities. The entire powder coating facility with the machines installed is an ergonomic, fully efficient production system.
All aluminium is prepared before painting with chemical surface treatment from Chemetall - European leader in this area.As the majority of Selt SPS products is exported to European countries, powder paints used are delivered by IGP, which Swiss roots are the safeguard of high quality. 

See more ...
2015-03-16

Q22

Today a contract between Echo Investment and Selt SPS was signed in Kielce. The contract covers entrusting the realization of sun protection to Selt SPS.Q22 is currently one of the most prestigious office realization in Poland, the high-rise is being built in Warsaw, at the crossroads of Jan Pawł II avenue and Grzybowska street.The bulding will stand on the same place as Fryderyk Chopin hotel from Mercure group, during the dismantling of which all materials were recycled, allowing to gain 1,500 tones of steel and 25,000tones of concrete aggregate. The office building was designed by one of the most renowned design office APA Kuryłowisz & Associates with the cooperation of Polish department of Buro Happoldand the total cost of the investment will be over 500 million PLN. The arcitectural height of the building which already gained BREEAM Interim Excellent certificate will be 195 metres.
Basic data

Investor: Echo Investments, Warszawa

Design office: APA Kuryłowicz&Associates/Happold Polska

Number of storeys: 43 with basement (5 storeys)

Sun protection systems in the project: by Selt SPS

Systems provided: Venetian blinds C50 Slim, Venetian blinds C50 Trapez, Refleksol, Veranda FTS, Veranda 206.

Anticipated completion date: 2016-17

See more ...
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole
2015-03-01
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole

Mikron VCE 600 PRO

Regarding the constant development of company and the aim to improve the quality of  products, SELT SPS company has enlarged the existing facilities by introduction of Mikron VCE 600 PRO, that has a very good work efficiency. Its main features are extraordinary stiffness and weight of the machine, high feed pressure and speed of the axis, big load capacity of the working table and an impressive force and spindle output capability.
The machine tool has a high class steering system by Heidenhain. MIKRON VCE Pro is tested and remarkably reliable group of machine tools.

 

In our factory there will be produced main elements of brackets for the Venetian Blinds, brackets for Refleksol systems, awning end caps and main elements for awning arms as well as complicated elements of the drive for the new system in SELT SPS – Pergola Solid. 

See more ...
2015-01-12

CAMPUS POPPELSDORF, BONN

Basic data

Architects: FRICK KRUGER NUSSER PLAN 2 GmbH

Ordering party / Investor: BAU-UND LIEGENSCHAFTSBETRIEB NRW

General contractor: BAM DEUTSCHLAND AG

Systems installed:

Venetian blinds C80 1446 pcs

Venetian blinds C50 Slim 52 pcs

Refleksol Ziiip 15 pcs

Veranda 206 16 pcs

See more ...
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole
2014-12-21
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole

CAMPUS DERENDORF, DÜSSELDORF

Selt SPS is about to finish yet another public utility facility project in Germany. There were used all together around 1500 pcs of sun protection systems.

Basic data:

Investor: Fachhochschule Düsseldorf

Project Office Nickl & Partner Architekten AG

Systems in use:

External Venetian Blinds C80L

Refleksols 120

Refleksols XL

See more ...
2014-04-03

UNIVERSITY CLINICAL HOSPITAL IN BIALYSTOK.

Currently, the largest in past fifty years expansion and reconstruction of the University Hospital. In total, there will be 2310 external Venetian Blinds installed on the Hospital's façade.
The installation is divided into two stages.
Stage I - 1370 units of Venetian blinds C80 and Z90
Stage II - 940 units of Venetian blinds C80 and Z90.


Basic data:
Investor: Medical University of Bialystok
Project Office: ArchDeco
General Contractor: Budimex SA
Systems in use: External Venetian Blinds C80/Z90

See more ...
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole
2014-03-07
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole

FORBES DIAMONDS 2014 FOR SELT SUN PROTECTION SYSTEMS COMPANY

      We are pleased to announce that company Selt Sun Protection Systems was recognized as the most dynamically growing company and took first place in Opole region in the category of companies with revenues from 50 to 250 million zloty. Thus, the work that has been put into developing the company that has recorded an increase in revenue of 50,51% over the years 2010-2012 has been recognized.

 

      This award is particularly valuable as companies were evaluated based on financial statements submitted to the National Court Register. In addition, the genesis of results of each company were checked in order to eliminate the companies in which a sharp rise in value was due to one-time extraordinary events.

 

      During the gala additional awards were given – e-Diamonds for companies that best utilize the potential of the Internet. This prestigious distinction has also landed in the hands of the SELT SPS company. Our website www.selt.com was declared as the best website in the region.

See more ...
2014-02-27

FENSTERBAU FRONTALE

Dear Sirs,

On behalf of SELT SUN PROTECTION SYSTEMS we would like to cordially invite you to our stand during FENSTERBAU FRONTALE trade fair, which will be held on 26-29.03.2014 in Nuremberg.
SELT SUN PROTECTION SYTEMS - HALL 3A/3A-424

Best regards,

See more ...
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole
2014-01-22
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole

PHILHARMONIC IN SZCZECIN COVERED BY SELT’S VERANDA SYSTEMS

     Company WARBUD S.A. is just finishing construction of a new building: Karlowicz Philharmonic Hall in Szczecin. The building  was designed by the Spanish Studio: Estudio Barozzi Veiga and resembles  interconnected white boxes  finished with pointy roofs. In this way, architects related to the neighboring buildings, including historic houses and buildings with multi pitch roofs.

     Due to the fear of too intensive sunlight, Veranda systems offered by SELT company were installed on the skylights. Veranda systems are designed for covering large, flat horizontal or inclined surfaces. HIGH-T-TEX fabrics which are used in Veranda,  due to its characteristics do not allow for the greenhouse effect inside the room, which allows for proper indoor comfort for the users.

     In addition to the concert halls, the Philharmonic hall will include a Café and exhibition space. The building consists of  two underground  floors with garage places and three  above-ground storeys. On the second floor there will be two concert halls, one for 900 people and the second one for 200 people.

See more ...
2013-10-02

EFFECTIVE SUNLIGHT MANAGEMENT IN SZCZECIN SPORTS HALL

     In Szczecin there is a modern Sports and Events Hall is under construction. The project by Design Studio Art Project includes main Hall building, as well as office-service and sports and recreation halls. The main building will house, among others: multi-function sports field, bleachers and social and sanitary facilities for athletes. Depending on needs and character of the event, the Hall can accommodate up to 7300 people.

     In the sports complex there will also be sports facilities and green areas for relaxation and recreation such as: basketball, volleyball, and tennis courts as well as soccer fields, a place to play table tennis, mini amphitheater for cultural events, green areas with fountain, bicycle paths and walking alleys.

     The Sports and Events Hall is equipped with modern sun protection systems offered by SELT SUN PROTECTION SYSTEMS. Effective sunlight management Is provided by SUNBREAKER system and the Markisolette – a product that is gaining more and more popularity, combining functions of awning and roller blind. The main goal of using those solutions is to reduce the amount of direct sunlight getting into the rooms, thus preventing overheating of the facility. At the same time, using sun protection products allows for a significant reduction in energy costs and operation of the facility, while providing maximum comfort of use.

See more ...
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole
2013-07-02
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole

ROSENGÄRTEN APPARTMENTS IN BERLIN AFTER SITE ACCEPTANCE EXAMINATIONS

      The building of Rosengärten residential complex in Berlin designed by architectural studios Bonanni Architekten and Patzschke & Partner Architekten has come to an end. It is a very unusual realization, where different colors of façades have been harmoniously compiled with colorful sun protection systems produced by Selt Sun Protection Systems. 1360 units of Markizolet and Refleksol ®103  have been fitted in each of the 210 apartments during the realization of this building, ensuring a great optical comfort and proper internal climate of the rooms for its inhabitants. Moreover, 25  Dakar Awnings have been installed on the terraces of the building to improve comfort during hot days.

 

Please visit the gallery below.

See more ...
2013-05-06

NEXT STAGE IN ATRIUM SOUTH WITH SELT BLINDS

      In the center of Warsaw there is a next stage of building office complex called Atrium South is underway. The building, designed by the architectural studio Kazimierski & Ryba, will have 14 floors, over 16 thousand m² of usable space and will become the official office of the biggest financial institutions and insurance companies. The office building, thanks to using the newest solutions, has gained the LEED precertification on the highest, platinum level, and the title of The Greenest Building in Poland, which is the confirmation of the quality and ensuring of optimal work environment for future users.

 

      It is an extremely prestigious investment also for the Selt Sun Protection Systems company, which provides 436 units of C50 blinds, designed to be placed between the two façades in the so-called ”double skin”. Venetian blind C50, unlike traditional solutions available on the market, has more rigid slats, and a smooth control of the slat angle gives the opportunity to freely adjust the light intensity depending on individual needs. Additionally, using the proper shading system allows adjusting the proper balance of light and shadow, which ensures the better work comfort.

See more ...
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole
2013-03-01
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole

PRESTIGIOUS INVESTMENT OF SELT SPS COMPANY

      Dynamic development and very active work on international markets have made the Selt Sun Protection Systems Tadeusz Selzer company has decided to meet the growing customer’s needs and increase its productive powers. An example to this is the investment worth 70 mln PLN that was accomplished at the beginning of 2013. The new administrative-storehouse-production complex has 31 thousand m², it is equipped in the newest machinery resources and gives employment to approx. 300 people. The building is not only functional but very attractive as far as design is concerned, bringing attention to its modern façade, on which the external shading system produced by Selt - the SUNBREAKER, has been installed.

 

      Selt is a modern and innovative company. Apart from the new building complex, the company has at its disposal three production sites, modernized this year, total area of over 61 thousand m²; in 2011 the company opened its own, very modern powder coating facility. Constant changing of architecture, particularly the trend to use the sun protection systems is no problem to Selt SPS, which is open to challenges, and designing new solutions. 

See more ...
2013-02-04

Bad Homburg and Usingen Clinics

Object: Hospital Clinics

Realization time: October 2012-March 2013

Investor: YOLANDE VERWALTUNGSGESELLSCHAFT mbH &
CO. VERMIETUNGS KG

Place: Bad Homburg, Usingen

Used systems: Venetian Blinds C80

Quantity: 1397 units

See more ...
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole
2012-10-25
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole

Rosengärten

Object type: Apartments
Realization time: August - March 2013
Place: Berlin (Germany) 
Architects: Bonanni Architekten
Patzschke& Partner Architekten 
Used systems: Refleksol 103, 
Markisolettes, 
Dakar Awnings 
Quantity: 1360 pcs

See more ...
2012-10-10

Handicaporganisationers

Realization time: November 2012

Place: Denmark
Used systems: Venetian blinds C-80
Quantity: 450 pieces
See more ...
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole
2012-10-05
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe Pergole

Certificate of Business Credibility

After verifying the financial data for the year 2011, the leading provider of global business information Dun&Bradstreet has awarded SELT Sun Protection System Tadeusz Selzer company the Certificate of Business Credibility. It is a prestigious title awarded only to the companies with the highest stability rating given by D&B Poland. Receiving this award confirms that the company has a  very good condition and liquidity, the risk of transactions with the company is minimal, and the level of debt and overdue payments are not registered or were negligible.

See more ...
2012-08-20

TAX Office

Object name: Oslo Tax Office

Realization time: October - September 2012

Place: Oslo (Norwegia)

Used systems: Refleksol ZiiiP

Quantity: 944 pcs

See more ...
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole
2011-12-14
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole

SELT’s powder coating facility

Range of colors offered by Selt Company is based on the RAL CLASSIC and VSR charts. Coating is applied in two techniques - powder coating and wet painting*.

Wet painting: 

It is used for the slats for Venetian blinds, since they have to be shaped after being painted. Supplier of aluminum wet painted sheets is a Swiss company METAL COLOR.   

Powder coating:

It is used in production of all of the systems provided by Selt SPS Company. Thanks to a modern, completely automated powder coating facility, Selt can offer products in the full RAL CLASSIC color range**.  

* Detailed information about color availability for specific products can be found in Selt SPS product catalogue. 

** Due to technical and production reasons, as well as because of the different coating techniques, there are possible slight color differences between components of the product.

 

Selt Company for powder coating uses paints provided by a renowned Swiss company - IGP. Using the IGP-DURA®Clean powders gives us a coating characterized by a hydrophobic surface and a small force of adhesion. This provides us with weak adhesion of the dirt to the coated surface, and allows for easy cleaning by water drops (self-cleaning effect).  

Quality is of paramount importance to Selt company, which is why our production follows the QUALICOAT requirements. Modern, well equipped laboratory conducts quality control tests in accordance with European norms:

- gloss evaluation (EN ISO 2813)

- coating thickness (EN ISO 2360)

- surface adhesion (EN ISO 2409)

- indentation test (EN ISO 2815)

- cupping test (EN ISO 1520)

- bend test (EN ISO 1519)

- impact test (EN ISO 6272)

- TQC MACHU test (accelerated corrosion test) 

See more ...
2011-09-27

Forest Opera House in Sopot

  • Object name: Forest Opera House in Sopot
  • General contractor: Alstal Grupa Budowlana
  • Investor: Sopot Town Council
  • Realization time: under construction - September/October 2011
  • Used systems: Veranda S, Veranda SR - above the scene, the stands and the opera building
  • Realization department: SPS Venetian Blinds and Refleksol Department
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole
2011-07-25
Markizy Sunbreakery Żaluzje fasadowe Pergole
Markizy Sunbreakery Żaluzje fasadowe PergoleMarkizy Sunbreakery Żaluzje fasadowe Pergole

PGE ARENA GDAŃSK

  • Object name: Stadium PGE ARENA GDAŃSK   
  • General contractor : "Metalplast - Stolarka" Sp. z o.o.
  • Investor :  Euro Cup Investment  headquarters in  Gdańsk
  • Architect : Project Office RKW
  • Realization time : 2011
  • Used systems : External Venetian Blinds C- 80,  External Roller Blinds XL.
Markizy Sunbreakery Żaluzje fasadowe Pergole